Saltwater Disposal Facility
 Orla, Texas

1/5

Ross Engineering completed the design for a 100kBBLW/D (expandable to 120kBBLW/D) Saltwater Disposal Facility in Culberson County, Texas.  Due to the nature of the project, time was of the essence for this private equity backed client.  To meet their strict timeframe, our engineering team specified and provided equipment recommendations, along with a complete engineering design for the project, which included eight multi-stage centrifugal pumps powered by 1,000 HP, 4160V medium voltage motors and variable frequency drives.  All electrical equipment was designed and specified by Ross Engineering and housed in two modular Motor Control Centers (MCC) buildings.

By utilizing custom designed shop-built MCCs and shipping them directly to the project site for electrical hook-up, we were able to meet the aggressive schedule so that the project achieved a startup date of within four months from the beginning of design.