• Grey Facebook Icon
  • Grey Twitter Icon
  • Grey LinkedIn Icon

© Copyright 2018 / The Ross Group Construction Corporation / All Rights Reserved

The Slug Catcher was an in-house design-build project. This was a harp style 3000BBL expandable to 5000BBL Slug Catcher that consist of eight 36” fingers running 320 feet on an elevated helical pile foundation system, 40’ vessel with an operating pressure of 1350 PSI, and catwalk system for access. 

‚Äč

The collaborative effort between Ross Group’s EPC and Engineering teams reduced the budget significantly and engineered the Slug Catcher with minimal downtime for the owner.

1/4

Slug Catcher

 Canton, Oklahoma